OUR EXPERIENCES





-          After Repair Installation and Commissioning Water Cooling Pump (BB3 API Pump), Conoco Phillips, South Natuna Sea

-          New Condensate Pump Installation and Commissioning (VS6 API Pump), Total E&P, Balikpapan

-          Water Injection Pump Installation and Commissionig (BB5 API Pump), Conoco Phillips, South Natuna Sea

-          Installation Lightnin Mixer (Side Entry), Sinar Mas Group, Tanjung Priok

-          Troubleshooting and Repair Antifouling Panel, Premier Oil, South Natuna Sea

-          Installation and Commissioning Bi Directional Pump (BB4 API Pump), Conoco Phillips, South Natuna Sea

-          Inpection and troubleshooting Wemco Agitator, Chevron Pacific Indonesia, Santan & Ataka, Samarinda

-          Commissioning Water Injection Pump (BB3 API Pump), Chevron Pacific Indonesia, Duri Pekanbaru

-          After Repair Installation and Commissioning Fire Water Pump c/w Engine Driven (VS6 API Pump), Pertamina Hulu Energy, Java Sea

-          After Repair Installation and Commissioning Condensate Shipping Pump

-          Installation and Commissioning Gel Breaking Pump c/w Gas Engine Driven and Automation Panel Controller (API 674 Reciprocating), Petronas

           Carigali, Ketapang Sea

-          Welding, Piping Fabrication and Installation Gel Breaking Pump, Technip – Petronas, Hanjung

-          Overhaul Engine Komatsu SAA12V, United Tractors, Jakarta

-          Overhaul Engine Generator Cat 3512, Tuban

-          On site Electric Motor and Vertical Pump Repair, Gheothermal Power Plant, Ulubelu

-          65 Units Fire Water Pump Assessment, Freeport Mcmoran Indonesia, West Papua

-          Welding, Piping Fabrication and Installation, Pertamina Oil Terminal, Cepu

-          Installation and Commissioning Air Compressor (2 stg recirprocating), Krakatau Steel

-          On Site Repair Fire Water Pump (Axial Split), Bukit Asam, Palembang

-          Installation c/w construction baseplate Water Injection Pump (BB3 API), Pertamina EP Tanjung